Techno-Economical Analysis

We prepared several power plant or cogeneration plant feasibility studies for investors, Techno-economical analysis reports covered comparison and evaluation of capacity alternatives including financial and economical aspects of the projects.

 

Global - 2x135 MWe Şırnak Power Plant Investment

Date

:

June 2008

Client

:

Global Yatırım Holding Inc.

Scope

 

:

 

Preparation of techno-economical analysis report for 2x135 MWe asphaltite fired, 

circulating fluidized bed, thermal power plant

 

DOSAB - 2x55 MWe Heat and Power Plant Investment

Date

:

March 2008

Client

:

Demirtaş Organized Industrial Zone

Scope

 

:

 

Preparation of techno-economical analysis report for 2x55 MWe lignite fired,

circulating fluidized bed, heat and power plant

 

MNG - 2x150 MWe Power Plant Investment

Date

:

October 2006

Client

:

MNG Holding Inc.

Scope

 

:

 

Preparation of techno-economical analysis report for 2x150 MWe lignite fired,

circulating fluidized bed thermal power plant

 

KARKEY – 135 MWe Power Plant Investment

Date

:

May 2006

Client

:

KARKEY Karadeniz Elektrik Üretim A.Ş.

Scope

 

:

 

Preparation of techno-economical analysis report for 1x135 MWe asphaltite fired,

circulating fluidized bed thermal power plant


Standart A.Ş. - 25 ve 50 MWe Power Plant Investment

Date

:

April 2005

Client

:

Standart Teknoloji Tic. A.Ş.

Scope

 

:

 

Preparation of techno-economical analysis report for Şırnak, 25 and 50 MWe asphaltite fired

fluidized bed thermal power plants

 

Funibo A.Ş. - Fluidized Bed Cogeneration Plant Investment

Date

:

July 2003

Client

:

Funibo Boya Sanayi A.Ş.

Scope

 

 

 

:

 

 

 

Preparation of techno-economical analysis and basic design studies for a fluidized bed

boiler plant to provide steam, electricity and heating oil of a textile factory.

EMRA licensing consultancy and technical consultancy services for funding.