Projects

Altek Alarko - Kırklareli Combined Cycle Natural Gas Power Plant

Location

: Kırklareli

Status

: In operation since December 2010

Duration

: 11 months

Client

: Altek Alarko Power Plant Construction, Operation & Trading Co. Inc.

Scope

: Supply of 1x20 MWe steam turbine, generator, generator protection

  & synchronization system; erection & commissioning supervision

 

Uğur Energy - Combined Cycle Natural Gas Power Plant

Location

: Çerkezköy, Tekirdağ

Status

: In operation since September 2010

Duration

: 12 months

Client

: Uğur Enerji Üretim Ticaret ve Sanayi A.Ş.

Scope

: Supply of 1x12.4 MWe steam turbine & generator; 

  erection & commnissioning supervision

 

Eti Mine Works - IV. Borax Pentahydrate Plants 160 t/h Steam and

10 MWe Power Plant

Location

: Kırka, Eskişehir

Status

: In operation since June 2010

Duration

: 24 months

Client

: ÖZTAŞ Construction, Construction Materials

  Trading Inc. (Main Contractor)

Scope

: Basic process engineering; supply of 1x160 t/h field erected 

  gas/fuel-oil boiler, 1x10 MWe back pressure steam turbine and

  generator; erection and commissioning supervision

 

Eren Energy - 2x600 MWe Supercritical Pulverized Coal Fired Power Plant

Location

: Çatalağzı, Zonguldak

Status

: In operation since June 2010

Duration

: 36 months

Client

: CMEC Corp.- China (Main Contractor)

Scope

: Project development, tecnical & administrative consultancy,

  local project management & site management support,

  local material supply, manufacturing & erection of pipe rack,

  manufacturing & assemby of building panels and roof coating

 

İÇDAŞ - 2x135 MWe Fluidized Bed Power Plant 

Location

: Biga, Çanakkale

Status

: In operation since September 2009

Duration

: 40 months

Client

: CMEC Corp.- China (Main Contractor)

Scope

: Project development, technical & administrative consultancy,

  local project management & site management support, 

  local material supply

 

Eti Soda - 2x10 MWe Fluidized Bed Cogeneration Plant

Location

: Beypazarı, Ankara

Status

: In operation since March 2009

Duration

: 22 months

Client

: CMEC Corp.- China (Main Conntractor)

Scope

: Project development, technical & administrative consultancy, 

  local project management & site management support,

  local material supply

 

Park Termik - Silopi 135 MWe Fluidized Bed Power Plant

Location

: Silopi, Şırnak

Status

: In operation since December 2008

Duration

: 36 months

Client

: CMEC Corp. - China (Main Contractor)

Scope

: Project development, technical & administrative consultancy, 

  local project management & site management support,

  local material supply

 

OYKA - 10 MWe Back Pressure Steam Turbine Maintenance

Location

: Çaycuma, Zonguldak

Status

: In operation since March 2008

Duration

: 10 days

Client

: OYKA Kağıt Ambalaj San. Tic. A.Ş.

Scope

: Modernization of 10 MWe back pressure steam turbine (Siemens) 

  dated 1970 and 20.000 hour overhaul

 

Alkim - Steam Boiler Control System Revision

Location

: Dazkırı, Afyon

Status

: In operation since August 2008

Duration

: -

Client

: Alkim Alkali Chemicals Inc.

Scope

: Steam boiler control system DCS software update

 

OYKA - 65 t/h F.Oil / Natural Gas Fired Steam Boiler Tubing Works

Location

: Çaycuma, Zonguldak

Status

: In operation since March 2006

Duration

: 3 months

Client

: OYKA Kağıt Ambalaj San. Tic. A.Ş.

Scope

: Complete mechanical maintenance and retubing of, fuel-oil fired, 

  67 atm /500°C / 65 t/h steam boiler (Steinmüller, dated 1970)  

 

İÇDAŞ - 135 MWe Fluidized Bed Autoproducer Plant

Location

: Biga, Çanakkale

Status

: In operation since December 2005

Duration

: 33 months

Client

: CMEC Corp. – China (Main Contractor)

Scope

: Project development, technical and administrative consultancy,

  combustion test realization, local project management and site

  management support, local material supply

 

OYKA - 10 MWe Back Pressure Steam Turbine Modernization

Location

: Çaycuma, Zonguldak

Status

: In operation since July 2005 

Duration

: 4 months

Client

: OYKA Kağıt Ambalaj San. Tic. A.Ş.

Scope

: Replacing all necessary parts of 10 MWe back pressure steam turbine

  (Siemens, dated 1970), improving performance, performing tests,

  installation supervision, manufacturing of spare parts

 

OYKA - 10 MWe Back Pressure Steam Turbine Gearbox Manufacture

Location

: Çaycuma, Zonguldak

Status

: In operation since September 2005

Duration

: 3 months

Client

: OYKA Kağıt Ambalaj San. Tic. A.Ş.

Scope

: Manufacturing and erection supervision of two new gears (8000 and

  1500 rpm) for 10 MWe back pressure steam turbine (Siemens dated

  1970)

 

Erdemir - 4. Slab Furnace Hydraulic Piping Works

Location

: Krd. Ereğli, Zonguldak

Status

: In operation since September 2005

Duration

: 5 months

Client

: MİMAG Cons. & Trade Inc. (Main Contractor)

Scope

: Supply, erection  and flushing up to NAS-6 level of high pressure 

  stainless hydraulic pipes, erection of grease, nitrogen and 

  compressed air lines